ICP’s main elevator is out of service. ICP’s galleries and school are accessible by stairs. If you need additional support, please visit the admissions desk.

Beekman Street subbasement. The demolition contract requires that the building be brought down to street level. Basements and tunnels are filled in and left buried beneath vacant lots

Beekman Street subbasement. The demolition contract requires that the building be brought down to street level. Basements and tunnels are filled in and left buried beneath vacant lots

Image: 12 3/16 x 7 15/16 in. (30.9 x 20.2 cm)
Paper: 14 x 14 13/16 in. (35.5 x 37.7 cm)
Credit Line
Gift of Dr. Stephen Nicholas, 2011
Accession No. 2011.65.26