Become a member by October 11 and get 14 months for the price of 12, plus the opportunity to win prizes in a member raffle. Join now!

Beekman Street subbasement. The demolition contract requires that the building be brought down to street level. Basements and tunnels are filled in and left buried beneath vacant lots

Beekman Street subbasement. The demolition contract requires that the building be brought down to street level. Basements and tunnels are filled in and left buried beneath vacant lots

Image: 12 3/16 x 7 15/16 in. (30.9 x 20.2 cm)
Paper: 14 x 14 13/16 in. (35.5 x 37.7 cm)
Credit Line
Gift of Dr. Stephen Nicholas, 2011
Accession No. 2011.65.26